图片展示
图片展示

Installation of 100 production lines for the first phase of Jiangxi Haili Stainless Steel Pipe Project

2016-08-06 00:00:00

Click:

“ On July 6, 2016, the reporter from 51 Stainless Steel was invited to Fuzhou High tech Zone to witness a historic moment when the first batch of equipment from Haili, Jiangxi was installed on site. The scorching sun is scorching, and the enthusiasm in the vast factory building is like fire. Factory engineering construction ”

Introduction

On September 17, 2015, Huazhou Haili Group signed an agreement with Fuzhou High tech Zone to produce 150000 tons of stainless steel pipes and frosted plates annually

Project contract;

On December 25, 2015, with a total area of 260 acres, a total investment of 3 billion yuan, and an annual output of 5 billion yuan, Haili Group - Jiangxi Haili

Founding of Technology Co., Ltd;

On June 10, 2016, the first phase of factory building infrastructure was completed;

On July 7, 2016, the stainless steel welded pipe production line entered the site and began installation.

Jiangxi Haili Science and Technology Co., Ltd., in accordance with the requirements of the 13th Five Year Plan of the country, is comprehensive in terms of products, equipment, technology, marketing, management, etc

Upgrading, in the words of Chairman Li Ruchang, means using the best stainless steel raw materials, state-of-the-art production equipment, and

Technology, making the best stainless steel pipes.


On July 6, 2016, the reporter from 51 Stainless Steel was invited to Fuzhou High tech Zone to witness a historic moment when the first batch of equipment from Haili, Jiangxi was installed on site.




The scorching sun is scorching, and the vast factory building is filled with enthusiasm. The construction machinery of the factory roars, and the workers sweat profusely. Li Ruchang, Chairman of Haili Group, and relevant leaders of Fuzhou High tech Zone visited the site to inspect the installation of the equipment.




The employee dormitory building 2 has now been roofed, and it only took Jiangxi Haili half a year from the foundation laying to infrastructure construction to equipment installation of the factory building

It is expected to start production in September. Fast construction, rapid production, and fast revenue will become important features of the construction of Jiangxi Haili Engineering

Point, Haili's speed has once again set an industry record.

      

 Mr. Li Ruchang, Chairman of Haili Group, said during a progress report to the leaders of Fuzhou High tech Zone.



    

The Jiangxi Haili project covers a total area of 260 acres and is being constructed in two phases - currently, the first phase of the project involves the construction of 100 stainless steel pipe production lines.

According to Chen Rong, General Manager of Guangdong Yangcheng Machinery, the stainless steel welded pipe production line currently supplied to Jiangxi Haili is the most advanced high-end welded pipe production line in China, with 8 design patents alone. It not only adopts Taiwanese technology, but also draws on advanced equipment design experience from Japan and Italy. It has high intelligence, automation, precision, strong equipment stability, fast mold changing speed, and can save a lot of labor costs.



The Guangdong Yangcheng welded pipe production line has undergone significant optimization and improvement in design, such as polishing stainless steel welded pipes,

Not only can machine spot checks be carried out, but intelligent networking is also possible, which means that no matter where you are, which production line in the factory produces more today

How many thin tubes, how many thick tubes, and how many quality problems exist can all be grasped in real-time through the mobile end


    

After listening to Chen Rong's introduction, all the guests present were full of praise.

There have been many interpretations in the industry regarding the layout of Haili in Jiangxi and its settlement in Fuzhou High tech Zone. The reporter traveled through Hunan and Jiangxi during this trip, experiencing the vibrant Jiangxi market and the influence of the "Haili" brand in this hot land.



      Taking into account some of the answers given by Mr. Li Ruchang, Chairman of Haili, in an interview with reporter [51 Stainless Steel], it is not difficult to understand why Haili is planning to layout Jiangxi:



Fuzhou has obvious advantages in transportation and location

Fuzhou is known as the "hometown of talents" and "cultural state", with high government efficiency and a favorable investment environment.

two

Market positioning strategy

Fujian Haili targets coastal areas and some export markets in Fujian and Zhejiang provinces; Jiangxi Haili targets Jiangxi Province, Hunan Province

Hubei Province, Anhui Province, and inland regions.

Logistics cost strategy

The transportation costs for raw material supply and product sales, relying on the upstream raw material supply advantages of Fujian Qingtuo Group, Fujian Haili

Potential, zero cost raw material logistics and transportation, only over 400 kilometers away from Jiangxi Haili, with both product sales bases located in the domestic region

Within 600 kilometers, it is also conducive to fast delivery to sales outlets and improving service quality.

Brand advantages of a strong country

Haili has been advertising on CCTV and has had a strong influence in regional brand awareness for 15 years, gradually shifting from a strong regional brand to a strong regional brand

Strive to strengthen national and even global brands. The layout of Jiangxi is an important step towards strengthening the national brand, and the future of Haili

We will continue to carry out base construction in Jiangsu, Shandong, and other places.

In terms of technical workers, we will transfer some people from the Guangdong headquarters to come over, and of course, we will pay more attention to the local professional skills in Jiangxi

Excellent talents from the technical school, and it is expected that our Jiangxi project will be put into operation by September


      

Li Ruchang told reporters at 51 Stainless Steel.

At the other end of the factory building, the automatic polishing machine provided by Maiduo Machinery and the online cutting table provided by Longxin Machinery have also started installation.

It seems that "Jiangxi Haili" has entered the "acceleration" stage, and "Haili Speed" will also bring more surprises to this hot land, giving the stainless steel industry more expectations.


Top
图片展示

Contact number: 400-0062-621

                 18933976801

E-mail address: gzycrong@163.com

Address: Xiaotang Xinjing Industrial Zone, Shishan Town, Nanhai District, Foshan City (beside Runfeng Comprehensive Market)

 

Copyright @ Guangdong YangCheng Machinery Technology Co., Ltd. All Rights Reserved

Enquiry hotline
18933976801
Qrcode
Scan code consulting
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.